Service Type: Engineering Services
Surda Abu Qash Municipality provides the service of requesting the construction of a speed bump or water drainage culvert to improve road safety and manage rainwater according to applicable regulations.
- Required Documents:
- Proof of identity.
- Service Completion Time:
4 working days.
- Fees:
Free of charge.
- Legal Reference:
• Cities, Villages, and Buildings Planning Law No. (79) of 1966 (Local Government Law).
• Building and Planning Regulations for Local Authorities (2011).
• Structural Plan of Sarda Abu Qash Municipality.
- Procedures:
- Receive the application and documents.
- Study the request.
- Conduct a site inspection and prepare a report on the condition and estimated cost.
- Approval by the Municipality Director.
- Notify the applicant of the result.
- Carry out the construction of the speed bump or water drainage.
- Responsible Department:
Engineering and Planning Department